- Overview
- Detailed Photos
- Product Description
- Main Features
- Product Parameters
- Packaging & Shipping
- Testing Machine
- FAQ
Basic Info.
Product Description
STARDRAWING 100/110/120mm Stunt Scooter Wheels PU on Aluminum Scooter Wheels
STARDRAWING 100/110/120mm Stunt Scooter Wheels PU on Aluminum Scooter Wheels
1) We use high grade industrial level polyurethane material, so the PU is very durable and long life service. Excellent for carve,drift,or side slide application.2) Standard Shore A 88 PU has a high rebound and superior shock absorbing ability.
3) We use precision double ball bearings, strong for high speed running.
4) A wide range of colors and sizes as options.
Tread Material | Wheel Core Material | Wheel Diameter(MM) | Tread Width (MM) | Inner Hole Diameter (MM) | Load Capacity (KG) |
PU | Aluminium | 60 | 24 | 8 | 90 |
PU | Aluminium | 64 | 24 | 8 | 90 |
PU | Aluminium | 72 | 24 | 8 | 90 |
PU | Aluminium | 76 | 24 | 8 | 90 |
PU | Aluminium | 80 | 24 | 8 | 90 |
PU | Aluminium | 84 | 24 | 8 | 90 |
PU | Aluminium | 90 | 24 | 8 | 100 |
PU | Aluminium | 100 | 24 | 8 | 130 |
PU | Aluminium | 110 | 24 | 8 | 130 |
PU | Aluminium | 120 | 24 | 8 | 130 |
PU | Aluminium | 100 | 30 | 8 | 150 |
PU | Aluminium | 110 | 30 | 8 | 150 |
PU | Aluminium | 120 | 30 | 8 | 150 |
PU | Fiber Filled TPU | 84 | 24 | 8 | 60 |
PU | Fiber Filled TPU | 90 | 24 | 8 | 60 |
PU | Fiber Filled TPU | 100 | 24 | 8 | 90 |
PU | Fiber Filled TPU | 110 | 24 | 8 | 90 |
PU | Fiber Filled TPU | 125 | 24 | 8 | 90 |
PU | PC | 110 | 24 | 8 | 100 |
PU | PC | 120 | 24 | 8 | 100 |
Dear : Can I get free caster wheel samples from Stardrawing ?
STAR : We would be honor to offer you free caster samples, and we believe that you would be willing to pay for the freight fee for such good products. Please provide your DHL/FedEx or other freight collect number and advise which express type should be chosen, international express type(2~3days) or economic type (4~5days).
Dear : What is your payment terms of caster ?
STAR : It is undisputable and crystal clear that 30% advanced payment, 70% before shipment, hope we have reached agreement for this regular payment manner.
Dear : What about your lead time ?
STAR : Usually, caster sample needs 5-7 days, mass production time needs 30 days. It is up to the quantity and stocking.
STAR : Sure.
Option 1 - Build the molds and fixtures upon your sample or technical drawings
Option 2 - Add your logo on fork or wheel
Option 3 - Pack the casters in your branded carton